阿克苏破簇美容美发化妆学校

Today:
首頁 > English > News Gallery > Company Everts > Company News

Dongting Lake Bridge -- The First Pile Cap Cast Successfully

Source:    Date:2014-02-14  

Recently, the No.6 pile cap of the Dongting Lake Bridge of the key control project of Mengxi-Huazhong railway was cast successfully. This is the first pile cap of Dongtinghu Lake Bridge that was cast in-situ successfully, which provide a favorable opportunity for the foundation construction of the pier shaft.

The No.6 pile cap is in rectangular shape, of which the dimension is 24m×9.2m×3.5m. It was cast by layers with one pour of C40 concrete, the total volume of concrete is 773m3.

up:

next:

大名县| 区。| 达孜县| 巫溪县| 崇文区| 福贡县| 临沧市| 龙岩市| 嘉鱼县| 南通市| 花莲县| 合作市| 兴山县| 巴彦县| 富顺县| 瑞昌市| 红桥区| 兴和县| 江门市| 奉新县| 东方市| 平安县| 尚志市| 桦川县| 随州市| 义乌市| 武冈市| 和林格尔县| 舞阳县| 教育| 崇州市| 海安县| 虎林市| 泸西县| 建阳市| 临潭县| 修水县| 洪湖市| 都安| 吴川市| 河池市|