阿克苏破簇美容美发化妆学校

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC awarded bid of tunnel works of ShenZhen LNG Project

Source:    Date:2013-07-02  

Recently, China Major Bridge Engineering Co.,LTD won the bidding of tunnel works of ShenZhen LNG Project, for which the Accepted Contract Amount is RMB 110 million, and will be executed by the fourth subsidiary.


ShenZhen LNG tunnel is the typical mountain tunnel, which is 584 meters long, and the side slope is 60 meters long. The Maximum buried depth of the tunnel is approximately 40 meters.

up:

next:

玉山县| 土默特左旗| 石楼县| 乌兰浩特市| 松滋市| 巴彦淖尔市| 西青区| 荣昌县| 怀来县| 小金县| 定兴县| 永胜县| 印江| 水富县| 且末县| 集贤县| 苏州市| 南充市| 新丰县| 甘泉县| 什邡市| 巴中市| 洛川县| 昌都县| 成都市| 双峰县| 綦江县| 嘉兴市| 灵丘县| 德江县| 朝阳市| 慈利县| 孟连| 公安县| 澳门| 平罗县| 大名县| 卓资县| 卢湾区| 突泉县| 东光县|