97人人超人人摸人人爱_亚洲色欲中文在线播放_久久精品免费AV热播_911亚洲精选青草衣衣麻豆,日韩亚AV无码一区二区三区_亚洲精品无码amm毛片_中文AV无码人妻一区

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Chaoyang Yandu New City East Street Bridge Project

Source:    Date:2013-03-26  

Recently, MBEC won the Bid of Chaoyang Yandu New City East Street Bridge Project in Chaoyang city, Liaoling province. With a total length of 277.44m, the bridge has a span arrangement of 29.98m+30.02m+2×90m+30.04m=270.04m, the width of the bridge deck is 34m. The main bridge is 2×90m two- span steel arch tower prestressing concrete girder cable-stayed bridge with double cable planes, arch tower of which is V-shaped. The approach bridge is of precast prestressing concrete T girder structures, with a total length of 90m and bridge deck width of 30m.

up:

next: