97人人超人人摸人人爱_亚洲色欲中文在线播放_久久精品免费AV热播_911亚洲精选青草衣衣麻豆,日韩亚AV无码一区二区三区_亚洲精品无码amm毛片_中文AV无码人妻一区

Today:
首頁 > English > News Gallery > Company Everts > Company News

Chongqing Dongshuimen Yangtze River Bridge Closed

Source:    Date:2013-02-06  

Chongqing Dongshuimen Yangtze River bridge being constructed by MBEC was successfully closed on 4 February 2013. With a total length of 1124.947m, the main bridge of the Chongqing Dongshuimen Yangtze River Bridge is a double-tower single-cable-plane cable-stayed bridge with span arrangement of (222.5+445+190.5). It carries duel-way four traffic lanes on the upper deck and double-line rails on the lower deck.

up:

next: