阿克苏破簇美容美发化妆学校

Today:
首頁(yè) > English > News Gallery > Company Everts > Company News

MBEC wins the bidding of Contract Section IV of Zongsi Line Project in Zhongshan

Source:    Date:2013-01-18  

Recently, MBEC won the bidding of Contract Section IV Section of Zongsi Line Project in Zhongshan City.


The IV Section of the Zongsi Line Project is 2.400km in length, including a super-large bridge. The main construction items include the work of road bed, bridge, culvert, route intersection, pedestrian flyover, road redirection and re-channeling, etc. The Grade I Road Standard is adopted and the main line is dual-way six lanes with the design speed of 80km/h and that for the supporting road is 40km/h.

up:

next:

铜梁县| 崇礼县| 佛学| 武平县| 读书| 白城市| 锡林浩特市| 绥芬河市| 揭西县| 柯坪县| 沅陵县| 峨眉山市| 呼伦贝尔市| 平湖市| 咸阳市| 富锦市| 喀喇| 广安市| 赤壁市| 射阳县| 福贡县| 武清区| 红安县| 定陶县| 壤塘县| 高雄市| 子洲县| 拉孜县| 江油市| 犍为县| 孝昌县| 岳西县| 玛纳斯县| 彩票| 巴塘县| 舟山市| 西乡县| 囊谦县| 抚远县| 双鸭山市| 上高县|