阿克苏破簇美容美发化妆学校

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Sichuang-Tibet Highway Reconstruction Project

Source:    Date:2012-08-20  

Recently, MBEC won the bid of section II of national highway No. 318 Sichuang-Tibet highway (Tibet side) Tongmai to No.105 reconstruction project. The accepted contract amount is 344.5 million RMB and the construction period is 3 years.


The total length of this section is 2.8 km, including subgrade, pavement, super major bridge and culvert etc. Polonggou super major bridge e is a composite cable-stayed Bridge with a main span of 430m.. The middle span of the main girder is composite girder, the side span is prestressing concrete girder. The span arrangement is (45+50+60+430+60+50+46)m.. This bridge has been recognized as the “First Bridge” of Tibet. The total length of the culvert is 1390m and the construction method is drilling and blasting method.

up:

next:

准格尔旗| 白水县| 宜春市| 镇坪县| 苏尼特左旗| 定结县| 夹江县| 横山县| 高台县| 城口县| 纳雍县| 石渠县| 望江县| 定襄县| 平利县| 永川市| 会同县| 晋城| 桓台县| 成安县| 安西县| 无锡市| 罗山县| 阿鲁科尔沁旗| 基隆市| 页游| 蓝山县| 淳化县| 洞头县| 靖安县| 遂平县| 巧家县| 巴彦淖尔市| 新竹市| 浦东新区| 安仁县| 漳州市| 盘锦市| 论坛| 平江县| 宜川县|