阿克苏破簇美容美发化妆学校

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Xuefu Bridge Project

Source:    Date:2012-07-20  

Recently, MBEC won the bid of Xuefu Bridge. The accepted contract amount is 217.5 million RMB and construction period 458 days.


Total length of this project is 1863.064m, including 758.397m long bridge and 1104.649m road . The total length of north auxiliary road is 465.75m and that of the south auxiliary road 433.853m. The width of standard cross-section of Taihu Avenue is 58m, the width of the bridge is 52m and the standard cross-section of auxiliary road is 10.5m.

up:

next:

波密县| 资阳市| 东辽县| 莱西市| 绥滨县| 嘉峪关市| 枝江市| 五常市| 潼关县| 普安县| 安吉县| 吴旗县| 泰和县| 甘泉县| 沙田区| 平泉县| 兰考县| 锦屏县| 湄潭县| 通江县| 宾阳县| 获嘉县| 胶州市| 柘荣县| 沁阳市| 吉林市| 托里县| 丰都县| 舞钢市| 文安县| 洪雅县| 莱芜市| 榆中县| 抚远县| 双桥区| 达拉特旗| 乐至县| 北川| 阳泉市| 屯留县| 延吉市|